Home > Product > active lime production line equipment
active lime production line equipment
Description:We, Jiangsu Pengfei Group Co., Ltd supply complete equipments for active lime production line with capacity below 1200 ton per day. The active lime is widely used in steel production, Al2O3 production, Metal Mg production, calcium carbide and Power plant desulfurization paper production area. Active lime is an important auxiliary material in steel making industry. The using of active lime enhances the quality and capacity and lower down the loss and cost. It also stabilizes the operation. As proved in production, the using of active lime in steel making industry is very profitable. Recently years, the capacity of steel industry used lime increased by 40%. High quality lime with activity above 300ml increased from 27% to 29.5%.
Explain:
1.Steelmaking practice certified that, the active lime can improve the desulfurization and dephosphorization efficiency of 80%, and shorten the smelting time. It can be completely take reaction with acidic substances in the molten steel in 3-5 minutes.The lime reaction time of shaft kiln need 6-10 minutes at least.And it also improve furnace ridge above 40%. The furnace burden consumption is reduced to 5-8Kg/t steel,calculated in 10000000tons,savings annual about 15000000,production efficiency is significant.
2.Desulfurization and dephosphorization efficiency of active lime is obviously improved,the average S removal rate of steel is 34.5% ,especially for high S iron (S ≥ 0.06%), efficiency is more obvious, and the S removal agent consumption can be reduced by about 45%.
3.Steelmaking with active lime,iron material consumption can be reduced by 5-15Kg/t steel,than non-active lime.And it also can reduce the steel splash and adhesion on oxygen lance;sticky mouth;flue sticking phenomenon.
4.Lime consumption decreased: steelmaking with active lime, the consumption can reduce 20~25Kg/t steel,compared with non-active lime.And if use non-active lime,consumption is more than 65~70Kg,if use active lime, is 40~41.5Kg/t steel.
5.Steelmaking with active lime,slagging is fast,desulfurization, dephosphorization ability is significant, the production efficiency can be improved by 5%~10%.
6.Quality requirement of the active lime limestone:CaO≥52% SiO2≮2.0% MgO≮1.5%

Process and equipment:
1.Raw material conveying system
Limestone, dolomite after crushing in the mine would be shipped to the factory.and by truck to the material pit,after screening,then conveying to raw material storage. Qualified lime stone particle size 10 ~ 50mm will be conveying to top silo of preheater by lifting equipment. Feed particle size is 10 ~ 50mm, discharging finished size of 5 ~ 40mm above 90%.

2.Active lime calcining system
Active lime calcining system consists of a vertical preheater, rotary kiln, cooler.
Vertical preheater:Vertical preheater is composed of a preheater body, a storage bin, a feeding pipe, hydraulic push rod device etc.. Preheater has polygonal and round using compartment partition device .Making the limestone gradually heating to avoid sharp warming burst into the kiln produces a large amount of powder, limestone decomposition rate is 30% ~ 40%, the average temperature of exhaust gas temperature is 230 ℃ ~ 260, thereby reducing the heat consumption.
Rotary kiln:rotary kiln is composed of cylinder, supporting device, transmission device,block wheel device, kiln tail and kiln head seal,and kiln head cover.The kiln body is 3.5% inclined of level,equipped with two sets supporting device, the roller bearing is the water-cooled oil lubricated bearings, and can automatically aligning with Spherical tile. Near the gear ring is also equipped with hydraulic blocking wheel,using frequency conversion motor driving kiln body, and an auxiliary driving kiln. Kiln head and kiln tail adopts spring type sealing device,using frequency conversion motor driving kiln and with preheater decomposition rate, to control effectively calcination temperature and time, reached the burning and burnt requirements.
Coal burner using coal and gas firing four channel burner. Flexible and convenient adjustment, flexible operation, each air jet velocity can be adjusted during operation, can bring up any flame in different kiln conditions, easy control of calcination temperature.
Vertical Cooler: vertical cooler is composed of cooler body, fixed screen, cooling device, electric vibrating discharging machine etc.. Vertical cooler has many cooling discharge area, each area discharging speed can be controlled separately according to material temperature; cooling air meet hot lime directly,cooling effect is well,ash temperature is low, ash temperature higher than the ambient temperature 40 ℃; cooling air after cooling lime, temperature can be preheated to more than 600℃, one part is used as second combustion air in rotary kiln, the other part is used to dry pulverized coal. Cooler is without moving parts, simple structure, good cooling effect, less equipment repair.

3.Pulverized coal preparation system
Pulverized coal preparation system is an important part of active lime rotary kiln system. There are generally two kinds of system, one is the wind swept coal mill tube mill pulverized coal preparation system with bag dust collector.The system has the advantages of convenient operation, clean environment etc.. Its production process is as follows: Block degree ≤ 25mm coal, from bucket elevator into the belt, then conveyed to coal bunker by belt, through disc feeder or electromagnetic vibration feeder that under coal bunker,the mill is a set of grinding, drying,when grinding, introducing hot air from rotary kiln system or flue gas from auxiliary combustion chamber to dry.Gas with coalcome out from coal grinding machine,in force of the exhaust pumping, enters the separator separation, coarse pulverized coal returned to the mill grinding again through automatic ash discharging valve,and the fine powder was driven into the bag dust collector in force of gas flow,to achieve powder and gas separated. Gas out from separator,the dust discharged after purification by an exhaust fan, a part of exhaust gas recycled in coal grinding mill,another part exhaust gas into the atmosphere through the chimney. Pulverized coal collected by the dust collector is discharged into the kiln coal storage bin.According to the need of coal warehouse, into the kiln front burner with a Roots blower, through the burner combustion air blower air supply for combustion, used for calcining limestone.

4.Finished product conveying system
Finished lime is conveyed to bucket elevator through chain bucket machine by cooler,then into top sieving grain silo by elevator, qualified part ≧5mm conveying to finished product bin by belt conveyer, powder≦5mm conveying to powder bin.Electric discharge valve is provided in finished product warehouse and powder bin. The main function of the finished product warehouse is for buffering measurement,the finished products should be promptly sent to the Steel Carbide factory to use reducing powdering.

5.Flue gas treatment system
High temperature flue gas from rotary kiln combustion, after the heat exchange with the limestone in preheater, the temperature dropped to 260 ℃ below,cooling through multi tube cooler and then into the high-temperature bag type dust collector.After dust collector,high temperature fan into the atmosphere through the chimney,the dust concentration is less than 30mg/Nm 3.
To meet requirements for the modernization process of active lime pre decomposition kiln production line, ensure the reliable operation of process equipment, stable process parameters, to ensure product quality, save energy, improve the production line running rate.The whole process adopt advanced technology controling, increase the DCS control on the basis of PLC control, centralized monitoring, operation and decentralized control of the main production line, control rotary kiln operating system to improve product quality and reduce consumption. To improve the reliability of electric control equipment and maintenance, to realize modernizatio of control, monitoring, operation.

6.Product quality
CaO ≥ 93, MgO ≤ 4.5, SiO2 ≤ 1, P ≤ 0.01, S ≤ 0.025 ignition loss ≤ 3, active degree ≥ 350ml ~ 380ml ≤ 1.5%, burning, burning ≤ 1.5%.
Process:
Qualified limestone deposited in the hopper, through hoist and transport into the top of silo.Preheater top bin, is made up of 2 level control the feeding amount, and then through the discharging tube of the limestone and uniformly distributed in the preheater each room.Limestone is heated from 1150°C to 900 ° C by kiln flue gas in preheater, about 30% decomposition, then into the rotary kiln by the hydraulic push rod,the limestone in the rotary kiln sintering is decomposed into CaO and CO2.After decomposition,limestone into cooler, the cold air is blown into the cooler cooling to 100 DEG C discharge. By 600 ° C hot air heat exchange into the kiln and gas mixing combustion.Gas mixed with cold air enter into dust collector by the fan,and through the exhaust fan into the chimney. Lime out of the cooler conveying into lime product warehouse by vibration feeding machine, chain bucket conveyor, bucket elevator, belt conveyor . According to the customer request whether screening processes...
Matching:
Vertical preheater
Vertical preheater is one of the main active lime equipment, the main effect of vertical preheater is the limestone material sent to the preheater, and use high temperature exhaust gas from the kiln calcining out emissions(1150 degrees Celsius), the material in the preheater evenly heated to about 900 degrees Celsius.In the preheating process of 30%CaCO3 is under preheater decomposition, and then by the hydraulic push rod into the rotary kiln calcination, calcination process that not only makes the limestone calcination time in the kiln is greatly shortened, obtain higher activities of lime.
Vertical preheater system mainly consists of six parts
1.Feeding system: mainly including the upper house, the discharge pipe, the materials and structure that can guarantee the body feeding safety sealed in preheater, so that the outside of cold air cannot enter into preheater inside, and material feeding can use stick valve to achieve continuous or intermittent feeding.
2.Preheater: it is the most important part of ensuring the material preheated to 900 degrees Celsius, which is composed of a preheating chamber, a suspension device and a refractory lining (this does not belong to the scope of equipment design and manufacturing) and other parts. This part of the structure is mostly metal component material selection, part of the heat-resistant steel according to the needs, working at 1000~1100 degrees Celsius high temperature heat-resistant steel. In addition, the refractory lining structure has the advantages of novel design, good sealing performance, can ensure material in preheater evenly preheated and achieve preheating temperature.
3.The pushing device: mainly including pusher, frame and the connecting rod part, pusher heat-resistant steel casting or welding to become, can withstand high temperatures, with the help of electric and hydraulic system, the hydraulic push rod can be automatic control procedures followed by pushing.
4.Hydraulic system: mainly comprises an oil tank, pump, motor, electromagnetic valve, hydraulic tubing, his main role is to control the pushing device, complete the pushing action.
5.Charging room: mainly including the chute feeding chamber, charging spout, body, its main function is to the material into the rotary kiln preheated calcined within.
6.Framework: It includes columns, ring beams , the main role is to carry the upper structure of the preheater
,
Technical
host performance 300t/d 600t/d 800t/d 1000t/d 1200t/d 1500t/d
preheater Type Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment
Shape Type 6 edges Type 12 edges Type 12 edges Type 18 edges Type 20 edges Type 22 edges
Preheating warehouse number 6 12 12 18 20 22
hydraulic push rod number 6 12 12 18 20 22
preheating amount(t) 1200 1200 1600 2000 2400 3000
Rotary kiln Specification Φ3.2×50m Φ4×60m Φ4.5×60m Φ5.0×58m Φ5.2×64m Φ5.6×76m
Slope 3.5% 3.5% 3.5% 3.5% 3.5% 3.5%
Rotary speed(r/min) 0.3-1.8 0.3-1.8 0.3-1.8 0.3-1.8 0.3-1.8 0.3-1.8
Burning temperature(℃) 1350 1350 1350 1350 1350 1350
cooler Type Partition upright Partition upright Partition upright Partition upright Partition upright Partition upright
Temperature controlling zone number 3 3 4 4 4 4
Air tower number 2+1 4+1 4+1 4+1 4+1 4+1
Specification(m) 3.6×3.6 4.1×4.1 4.7×4.7 5.2×5.2 5.4×5.4 5.8×5.8
Discharging temperature(℃) ≤80 ≤80 ≤80 ≤80 ≤80 ≤80
Product heat consumption(KJ/kg) 5400 5400 5000 4750 4600 4500
Adaptable fuel coke oven gas, mixed gas, natural gas, pulverized coal, low-heat value gas

Ohter Products
active lime production line equipment
600 tons of active lime production line equipment
1000 tons of active lime production line equipment
 Print [ close ] Top
Copyright © Jiangsu Pengfei Group Co.,Ltd. All Rights Reserved.
色综合久久久久网_精品一区二区在线观看_久久天堂久久_国产精品黄页免费高清在线观看
久久久91精品国产| 巨乳诱惑日韩免费av| 日韩视频在线一区二区| 一本色道久久综合亚洲精品婷婷| 一本一本久久| 欧美一级在线播放| 免费视频最近日韩| 欧美日韩国产成人在线免费| 国产精品青草久久| 在线免费高清一区二区三区| 夜夜嗨av色一区二区不卡| 欧美一区高清| 欧美激情导航| 国产日韩欧美一区在线| 亚洲黄色影片| 亚洲欧美中文字幕| 欧美成人免费在线观看| 久久精品男女| 欧美久久久久久久久| 欧美精品在线一区二区| 国产精品日本一区二区| 亚洲高清一二三区| 亚洲黑丝在线| 性色av香蕉一区二区| 欧美成人69av| 免费欧美高清视频| 国产精品一级在线| 亚洲人体影院| 久久av在线看| 欧美视频观看一区| 亚洲电影欧美电影有声小说| 亚洲国产精品成人综合| 亚洲综合日本| 欧美国产综合视频| 国产一区二区精品丝袜| 一本久久a久久免费精品不卡| 久久久夜夜夜| 你懂的国产精品永久在线| 国产精品青草久久久久福利99| 亚洲国产裸拍裸体视频在线观看乱了| 亚洲影视综合| 欧美伦理视频网站| 在线观看av不卡| 日韩视频永久免费观看| 久久先锋资源| 国产欧美日韩激情| 国产精品99久久久久久久久久久久 | 国产日韩欧美日韩大片| 一区二区三区成人精品| 欧美国产日韩免费| 在线观看一区欧美| 久久久精品性| 国产亚洲精品久久飘花| 亚洲欧美另类国产| 性欧美video另类hd性玩具| 欧美日韩国产成人在线| 最新成人在线| 美女视频黄a大片欧美| 国产一区二区日韩| 午夜精品福利电影| 国产精品久久久久国产a级| 国产麻豆视频精品| 亚洲一区二区3| 欧美三级精品| 一区二区欧美日韩| 欧美日韩激情网| 国产日韩欧美日韩大片| 亚洲激情视频在线| 亚洲资源在线观看| 欧美日韩中文| 一区在线视频| 久久精品综合网| 国产一区二区主播在线| 久久成人18免费网站| 国产婷婷精品| 久久激情五月激情| 国自产拍偷拍福利精品免费一| 欧美在线999| 国产亚洲一区精品| 久久久久久亚洲精品中文字幕 | 精品91视频| 久久综合色8888| 亚洲第一精品影视| 欧美高清视频一二三区| 亚洲精品综合在线| 欧美日韩国产经典色站一区二区三区| 亚洲精品日韩精品| 欧美日韩精选| 亚洲综合精品四区| 国产一区二区三区高清| 久久久精品一区二区三区| 一区在线观看| 欧美金8天国| 亚洲视频免费| 国产精品日韩在线| 久久精品视频网| **欧美日韩vr在线| 欧美精品一区二区三区高清aⅴ| 国产一区视频在线观看免费| 欧美在线视频一区二区三区| 黄色成人免费网站| 免费在线观看日韩欧美| 99精品视频免费观看视频| 国产精品草莓在线免费观看| 午夜精品影院在线观看| 国产一区二区三区自拍| 蜜桃久久av| 一本综合精品| 国产欧美日韩综合精品二区| 久久麻豆一区二区| 亚洲毛片在线免费观看| 国产精品久久久久一区二区三区 | 亚洲一区久久| 国内精品一区二区| 欧美国产精品中文字幕| 亚洲视频高清| 国产在线国偷精品产拍免费yy| 另类激情亚洲| 一区二区欧美激情| 欧美福利一区| 亚洲一区二区在线视频| 狠狠色综合色综合网络| 欧美区亚洲区| 欧美一区二区性| 亚洲激情第一页| 国产精品久久二区二区| 久久视频在线看| 正在播放亚洲一区| 激情视频一区| 久久网站热最新地址| 99riav国产精品| 国产日韩欧美在线播放| 欧美高清视频在线播放| 欧美亚洲综合网| 亚洲精品亚洲人成人网| 国产视频亚洲精品| 欧美日韩国产综合一区二区| 久久精品导航| 一本大道av伊人久久综合| 国产一区二区高清不卡| 欧美日韩国产区一| 久久久久青草大香线综合精品| 一本色道久久综合狠狠躁篇怎么玩 | 国产精品入口66mio| 红桃视频亚洲| 国产一区二区欧美日韩| 久久人人爽人人| 亚洲精品专区| 国产午夜精品在线观看| 欧美不卡视频一区| 亚洲欧美日韩中文在线制服| 亚洲激情在线播放| 国产欧亚日韩视频| 欧美激情一区二区三区在线视频| 亚洲欧美日韩一区二区三区在线| 亚洲国产91精品在线观看| 国产精品免费aⅴ片在线观看| 美女网站在线免费欧美精品| 亚洲欧美日韩在线观看a三区| 亚洲国产婷婷香蕉久久久久久99 | 欧美日韩视频第一区| 久久久久久亚洲精品杨幂换脸| 亚洲一区欧美二区| 亚洲精品一区二区三区蜜桃久| 国产综合色在线| 国产精品视频久久久| 欧美日韩国产三区| 牛牛影视久久网| 久久精品视频导航| 午夜精品久久久久99热蜜桃导演| 亚洲毛片网站| 亚洲黄色精品| 激情综合在线| 国产精品免费一区二区三区观看 | 欧美久久久久久久| 美女图片一区二区| 欧美在线视频观看免费网站| 亚洲影视综合| 亚洲视频久久| 欧美亚洲成人精品| 欧美极品一区二区三区| 久久天天狠狠| 久久xxxx| 欧美中在线观看| 欧美有码视频| 欧美一级理论片| 午夜精品福利电影| 亚洲女人av| 亚洲在线观看视频| 亚洲一区二区视频在线观看| 中国女人久久久| 在线视频一区二区| 一区二区三区国产精品| 一区电影在线观看| 亚洲午夜久久久久久久久电影网| 夜夜嗨av一区二区三区四区| 99精品免费网| 亚洲网站在线| 亚洲免费在线视频| 欧美一级大片在线观看| 久久高清福利视频| 久久午夜国产精品| 欧美成人自拍视频| 欧美精品日韩综合在线|